01 — New service
Service entrance and underground feed
- Scope
- New service entrance
- Supply
- Overhead pole to underground feeder
- Includes
- Meter, disconnect, riser, trenched run
- Setting
- Open build site
Power brought to a site that did not have any. The meter and service disconnect are mounted at the utility pole, with the riser running down the pole to grade and the feeder trenched underground toward the structure. The bare copper at the base is the grounding electrode conductor.
Getting power to an empty lot is the job that has to happen before any other electrician can do anything. It involves the utility, the permitting office and a trench, which means it is scheduled work rather than something that happens on a phone call.
The disconnect sits outside and clearly labeled. Current code requires an exterior emergency disconnect on one- and two-family dwellings, and it is what a first responder is looking for when they arrive at a property they have never seen.